Skip to content

Alpharetta Kitchen & Bath Remodeling

  • Home
  • Kitchen Costs
  • Bathroom Costs
  • Blog
  • Book Online

Quartz vs. Quartzite vs. Granite: A 2026 Comparison

August 3, 2026August 3, 2026 by alphkitch
A finished, fully furnished transitional kitchen with warm ivory perimeter cabinetry and a large island topped in dramat

Quartz, quartzite, and granite compared for North Atlanta kitchens: 2026 installed cost ranges, sealing and heat limits, and which stone fits your household.

Categories Remodeling Notes Tags countertops, granite, kitchen design, quartz, quartzite

How to Choose a Kitchen Contractor in Georgia: 6 Questions

July 30, 2026 by alphkitch
A finished, fully furnished warm ivory kitchen in an upscale North Atlanta home: inset shaker cabinetry, honed quartzite

Georgia licenses contractors on work above $2,500. How to verify one, the six questions to ask, and the bid and payment red flags worth walking away from.

Categories Remodeling Notes Tags contractor red flags, hiring a contractor, kitchen remodel

Zellige Tile: A Complete Kitchen and Bath Guide

July 27, 2026 by alphkitch
A finished warm ivory kitchen with a full glossy white zellige tile backsplash running from counter to upper cabinets, q

Authentic zellige runs about $40-$70/sq ft installed. What it is, why the imperfection is the point, and how to install it right.

Categories Remodeling Notes Tags kitchen backsplash, tile design, zellige tile

Kitchen Remodel ROI in Atlanta: What You Actually Get Back

July 23, 2026 by alphkitch
a finished, elegant midrange remodeled kitchen with white shaker cabinets, a quartz island, subway tile backsplash, and

Minor kitchen updates often recoup 75-125% at resale; major remodels typically land near 50-85%. What that means for your Atlanta home.

Categories Remodeling Notes Tags kitchen remodel, renovation ROI, resale value

Bathroom Remodel Timeline: What to Expect

July 23, 2026 by alphkitch

A bathroom remodel in North Atlanta takes 4-8 weeks of construction, 2-4 months total. See the week-by-week timeline, cure windows, and inspection gates.

Categories Remodeling Notes Tags bathroom remodel timeline, bathroom renovation, North Atlanta remodeling

Taj Mahal Quartzite vs. Granite: Which Is Right in 2026?

August 11, 2026July 16, 2026 by alphkitch

Taj Mahal quartzite runs $90-$150 per square foot installed; granite $50-$100 in Atlanta. Durability, etching, heat, and maintenance compared for 2026.

Categories Remodeling Notes Tags granite countertops, kitchen countertops, Taj Mahal quartzite
Newer posts
← Previous Page1 Page2
© 2026 Alpharetta Kitchen & Bath Remodeling • Built with GeneratePress